Commitment to accelerate work, reopening scheduled for 2023
(ANSA) – CUNEO, 10 JAN – Emmanuel Macron has worked with the French and Italian local administrators to speed up the times for the reopening of the international tunnel of Tenda, closed after the flood in October 2020 and which is expected to reopen to traffic for now at the end of 2023.
“The state is close to you”, assured the president of the French Republic during his visit to the Roya valley this afternoon. There are several references to the recent ‘Quirinale Treaty’ recently signed with the Italian President Sergio Mattarella, which also plans to create a cross-border cooperation committee to accelerate the renewal of the convention for the international train between Turin-Cuneo-Ventimiglia up to Nice in French Riviera.
For Italy there were the mayor of Limone, Massimo Riberi, the deputy mayor of Cuneo and former senator Patrizia Manassero; for Liguria the mayors of Olivetta San Michele and Airole, Adriano Bianchieri and Maurizio Odoero. (HANDLE).