Home » Clear water, clear water, and people’s hearts, a city with clear water comes into painting

Clear water, clear water, and people’s hearts, a city with clear water comes into painting

by admin
Clear water, clear water, and people’s hearts, a city with clear water comes into painting

Clear water, clear water, nourishing the hearts of the people, a city with clear water comes into the painting

In order to let 520,000 people in Chongyang drink good water

The beautiful scenery of Qingshan Reservoir in Chongyang Photography: Zhang Dalue, Jimu News Correspondent of Chutian Metropolis Daily

From drinking mountain spring water to drinking tap water

“One Spring of Good Water” leads from Qingshan Water Plant to thousands of households

Water monitoring is equipped with the “strongest brain” Photo: Chutian Metropolis Daily Jimu News reporter Cheng Yuxun

□Chutian Metropolis Daily Jimu news reporter Cheng Yuxun correspondent Rao Qingcai Wang Jia Huang Liming intern Li Weidan

Water, the source of life. Water conservancy projects are safety projects, livelihood projects, and development projects.

Chongyang County, Hubei Province is surrounded by mountains, peaks and ridges, and the farther away, the higher it is. In this beautiful natural environment, Chongyang County Party Committee and County Government solved the long-standing problem of water use for residents.

For this source of life, up to now, Chongyang County has built 109 reservoirs, including 1 large-scale reservoir, 4 medium-sized reservoirs, 11 small-scale reservoirs, and 93 small-scale reservoirs. From drinking water to drinking good water, from comprehensive coverage to intelligent management, pictures of water conservancy development are drawn here in an orderly manner.

On June 13, Jimu news reporters visited the Qingshan Reservoir in Chongyang, and strolled on the dam. The water conservancy public facilities that can stand the test and bring benefits are silently guarding the flood control safety, water supply safety, food safety and ecological safety of the 520,000 people in Chongyang.

From “drinking water” to “drinking good water”

“Before this season, there was no water for more than ten meters of wells. Now it’s different. You don’t have to worry about running out of water at all. Everyone can drink safe and clean water stably. We are happy from the bottom of our hearts!” The clear tap water is rushing out of the tap. Huang Yong, a villager who lives in Maqiao Village, Tongzhong Township, Chongyang County, sighed to the Jimu News reporter.

Under the sunlight, the water surface is sparkling, and the water flows along the channels to the Tongzhong Water Plant. After precipitation, filtration and sterilization, the treated water flows to thousands of households in Tongzhong Township through the pipe network. The total investment of the water diversion reconstruction and expansion project of Tongzhong Water Plant is 17.58 million yuan. The construction started on August 5, 2021. The construction of the 1500m^3 clear water pool project has been completed, and the production of the integrated water purification equipment manufacturer with a daily water supply of 5000m^3 has been completed. The 8.6-kilometer water diversion main line from the double line to the Tongzhong Water Plant has been laid, and the 4.3-kilometer water supply main line from the Tongzhong Water Plant to the Chia Tai Group has been laid, and 85% of the work has been completed.

See also  The Spiritualized live in a different time from ours - Giovanni Ansaldo

It is understood that Chongyang County is a seasonal water shortage, and the water comes and goes quickly. The construction of high-standard, high-quality water conservancy projects can make full use of every drop of water. Qingshan Reservoir has a total storage capacity of 430 million cubic meters and has excellent water quality. It is a county-level centralized drinking water source in Chongyang County and is known as the “big water tank” for the people of the county.

“It’s easy to get dirty water, but it’s really difficult to clean it up, drink it, and drink it with confidence… The water pressure and volume are very stable now. Not only has the water volume improved, but the water quality has not fallen behind.” At Qingshan Water Plant Wang Zhiming, the old factory manager who has worked for more than ten years, told Jimu News reporter that the water quality in Chongyang has been improved step by step to the current level, and he has become the most direct witness.

In recent years, Chongyang County Party Committee and County Government, County Ecological Environment Bureau, Water Conservancy Bureau, Wetland Park Management Office and other departments have formed a joint force to adhere to both source control and water quality improvement to protect this clear water. Through a series of measures, the water quality of Qingshan Reservoir has been effectively improved. On September 6, 2021, the test results showed that the water environment quality from January to July 2021 reached the “Surface Water Environmental Quality Standard” (GB3838-2002) Class I water quality standard.

Water conservancy facilities are about to achieve full coverage

“When a flood disaster happened and the reservoir was in danger, due to inconvenient transportation, rescue workers and construction vehicles could not arrive at the site for timely disposal. Many times they were anxious but helpless…” Recalling the past difficulties, Director of Chongyang County Water Conservancy Bureau Zhang Zhaohui still has a fresh memory.

The reservoir needs to solve far more than the water problem. In order to arrive in time and deal with the possible problems in time, the road must be hardened. At the same time, the implementation of rural road hardening is not only the basic support for improving the rural living environment and promoting the rural revitalization strategy, but also a powerful starting point for implementing the high-quality development of water conservancy construction.

See also  The Ministry of Housing and Urban-Rural Development has clarified that this year's eight key tasks will promote the structural reform of the housing supply side - Teller Report

In recent years, the Chongyang County Party Committee and the County Government have taken extraordinary measures and efforts to overcome the impact of the epidemic, and made every effort to speed up the construction of water conservancy infrastructure in the spirit of nailing the nails. While improving the water conservancy construction management system and mechanism, it also established a leading group for the supervision and management of water conservancy project construction, and successively formulated and issued the “Chongyang County Water Conservancy Project Construction Supervision and Management Measures” and “Chongyang County Drinking Water Safety Rural Water Supply Industry Supervision” Management Measures” and other documents, effectively standardize the construction of water conservancy projects, and establish a long-term mechanism for supervision and inspection in the field of water conservancy project construction.

In order to speed up the adaptation to the new changes and new requirements in the field of water conservancy construction, and ensure the work and life of the management personnel of large, medium and small reservoirs in the county, Chongyang County has also raised project funds from various sources to build management rooms, equipped with duty rooms, control rooms, laboratories, Offices, etc., are equipped with “navigators” for supervision and management work. At present, 80% of the county’s large and small reservoirs have achieved road hardening and management housing construction. Systematic and professional construction and management make Chongyang water conservancy project like nectar, quietly moisturizing the hearts of Chongyang people.

At present, Chongyang County is actively applying for a provincial-level model county for deepening the reform of the small-scale reservoir management system, conscientiously summarizing experience, consolidating the reform effect, promoting the further implementation of small-scale reservoir management and protection subjects, management and protection personnel and management and protection funds, strengthening daily management, and ensuring reservoirs Safe operation and benefit play.

“Smart Water Conservancy” installs the “strongest brain” for water control

“The whole process of water purification is fully automated and controlled and monitored by digital video system, which realizes the scientific standardization, strictness and efficiency of water treatment operation, and ensures the safety of every drop of water.” Zhang Zhaohui opened the monitoring program in his mobile phone and told Jimu News According to the reporter, with visual intelligent management, water conservancy monitoring is like equipped with the “strongest brain”. It can achieve 24-hour real-time monitoring without consuming too much manpower and material resources, and 360° monitoring of reservoir conditions without dead ends.

See also  Millos seeks to start his journey in the South American Cup with a victory

It has always been an important goal of rural water supply reform to provide rural residents with stable and safe water and to provide stable water power for rural revitalization. Today, the small and medium-sized reservoirs scattered in the countryside of Chongyang have strode into the era of standardization and refinement of management.

Tianmenguan Water Plant is the first batch of modern high-tech water plants implemented in Chongyang County with “ultrafiltration membrane” as the core water production unit. The designed water supply scale is 500 tons per day, and the total investment of the project is 1.6 million yuan. The water plant fundamentally solves the problems of drinking water safety in the three administrative villages of Yanglin, Xizhuang and Huayuan, including water quantity, quality, convenience of water use, and reliability of water sources. From the disinfection workshop, sedimentation tank, water purification tank to the final water supply workshop, each workshop is interlinked, closely linked, and operates in an orderly manner. The gurgling water played clear music, gently telling the story of the water plant.

Relying on smart information technology, the information of each monitoring point can be retrieved and checked at any time, which is equipped with “clairvoyance” for urban and rural water supply. Entering a new era, changing the concept and mode of drinking water safety construction management and realizing digital and information management has become a new demand and new expectation of the people, and a new mission of rural drinking water safety work. Adhere to the working concept of ecological priority and long-term management and protection, continue to deepen the reform of the reservoir management system, and continuously improve the management level. At present, various water conservancy projects in Chongyang have basically achieved a good situation of making the best use of water, using water to support water, and harmonious coexistence between man and nature.

Standing on a new historical starting point, the Chongyang County Party Committee and County Government will reorganize and start again. In field investigations and precise policy implementation, the quality and efficiency will be continuously improved, so as to provide a powerful tool for building a moderately prosperous society in an all-round way and implementing rural revitalization. support. In the foreseeable future, Chongyang will continue to compose a more splendid water conservancy chapter.

You may also like

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy