Home » Zhengzhou Metro Line 5 Shakou Road Station is working hard to drain a male body found in the tunnel | Lost contact_sina news

Zhengzhou Metro Line 5 Shakou Road Station is working hard to drain a male body found in the tunnel | Lost contact_sina news

by admin

Original title: Zhengzhou Metro Line 5 Shakou Road Station is working hard to drain a male body found in the tunnel

According to the Henan Provincial Department of Emergency Management on July 23, heavy rainfall in Henan has caused 56 deaths and 5 missing. According to the news from “Netxin Zhengzhou”, as of 12:00 on July 23, according to preliminary statistics, the floods and secondary disasters caused by heavy rains in Zhengzhou have caused 51 deaths. Previously, Zhengzhou Metro announced on July 22 that a train on Line 5 was trapped between Shakou Road Station and Beach Temple Station due to heavy rain on the 20th. More than 500 passengers were rescued, 12 people were killed, and 5 passengers were sent to hospital for observation. , The vital signs are stable.

Red Star News previously reported that because the official has not yet announced the list of victims, some people who have suffered “lost connections” from relatives and friends have successively posted help messages online, looking for “lost connections” on Zhengzhou Metro Line 5. As of the morning of July 24, at least two passengers who took Line 5 on the night of the incident were still missing. Their families have been waiting at the Shakou Road Station of Metro Line 5 for the end of the drainage of the subway for further search and rescue.

▲On-site at Shakou Road Station of the Metro.

At around 9:45 am on July 24, the police on the scene notified the family of the missing person that a male body was found during the water pumping and search and rescue process, and the body needs to be further pumped and cleaned before it can be salvaged. However, the current photo has been identified by two family members at the scene, and it has not been confirmed whether it is his family.

See also  The big boss behind the continuous thunderstorms in China's financial circle has fled with a huge sum of 1 billion | Lin Qiang | Yu Lei | Hehe Capital | Lost contact | Seriously insolvent | Unable to pay | Ping An Trust | Default | Run away with the money | Investors | Finance | Thunderstorm | Losing everything

The Red Star News reporter saw at the scene that a number of engineering personnel were working on site, and the two water pumps were doing their best to drain water.

▲On-site at Shakou Road Station of the Metro.▲On-site at Shakou Road Station of the Metro.

On July 23, the chief engineer of Zhengzhou Metro introduced that it was already passable between Shakou Road Station and Haitansi Station, but the water level between Haitansi Station and Zhengzhou People’s Hospital Station was still relatively high. “The highest water level is about 5 meters. , The middle part of the tunnel is still filled with water.”

In addition, the chief engineer of Zhengzhou Metro explained that he had tried to use “long suction” drainage equipment to drain water, but the equipment was too large to be used inside the subway, and finally had to be abandoned. According to estimates, on the afternoon of the 24th, the accumulated water in the three stations will be pumped to a level that can be searched and rescued.

Red Star News reporter Pan Junwen reports from Zhengzhou, Henan

Editor in charge: Chen Yan SN225

.

You may also like

Leave a Comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy